Chapters:

Empenage (8)
This includes the Vertical and Horizontal stabilizer, the rudder and elevators. COMPLETE!
Wings (10)
  This includes the left and right wings with fuel tanks! I have completed one tank and am working on the other one. The flaps and ailerons have been completed. 
Fuselage (11)
  work in progress! 
Engine / Prop (13)
  Decided on a Superior IO-360 with a fixed pitched seninich prop. The engine is capable of being upgraded to a constant speed (when I find the extra 8k) The ignition will use 1PMag and 1EMag. I will be going to Redding, CA in April to build the engine at the Eagle Engine shop. Update! I finally made it to Redding and built the engine 10.22.06. What a great experience! I suggest if you have the chance, build your engine! 
Panel (8)
  Designed and waiting for bids to cut the panel. Take a look at the projected design. UPDATE! I have the panel ordered along with my Dynon D100. should be here shortly! 
Finishing Kit (0)
  this includes the canopy and all the fiberglass. After inventory, i have it spread all over the house. I need to get the fuselage done so i can get this stuff out of the way! 
Building Mascot (2)
  I have a few four legged friends that help build. 
Click thumnails to view larger image


Horizontal Stab 


Completed vert stab 


Completed Hor. stab and elevators 

<<- Previous PagePage 2 of 2Next Page ->>
Click this image to show a large image in another window.

Image Description